This project involves a feasibility analysis of over 400 sites within the Capital Regional District to identify potential locations for solar photovoltaic (PV) installations. The study shortlisted 32 sites, with detailed analysis of the top 10, including hourly energy generation versus consumption, 3D solar PV design, capacity estimation, and shadow analysis. The selected sites, representing the highest energy consumers are recommended for prioritized solar PV integration and investment.

Partner: Capital Regional District (CRD)
Funder: BC Hydro
Keywords: renewable energy, solar photovoltaic

Ali Hyder
2024